Thinking About Remodeling Your Own Pool?

A plain-English guide to owner-managed pool remodels in Arizona: what the law allows, what’s hiding under your old finish, why a remodel is harder to self-manage than a new build, and how to decide before you drain a drop.

Download the free printable guide (PDF)

2026 EDITIONA.R.S. TITLE 32 & 33 REFERENCESAZ ROC KA5-353555

Read this first

You got a quote to resurface your pool, maybe add new tile and coping, and the number was higher than you expected. Then someone told you a remodel is just a few separate trades: drain it, have a plaster crew shoot a new finish, have a tile setter swap the waterline tile, and fill it back up. Hire them yourself and keep the markup.

On paper that sounds simpler than building a pool. In practice it’s harder. A new pool starts with a clean hole in the ground. A remodel starts with someone else’s decades-old work, and you don’t find out what’s wrong with it until the water is out and the clock is running.

This guide walks through what the law says, what you’d be responsible for, and why self-managed remodels go wrong more often than self-managed builds. We quote the Arizona statutes directly, and every source is listed at the end.

Free download

Get the printable guide + checklist

The complete guide as a 23-page PDF you can print, mark up and share with your family, including:

  • The protect-yourself remodel checklist
  • 12 questions to ask every remodel trade
  • The line-by-line savings worksheet
  • The hidden-problems chart for drained pools

We will also email you a copy. Your information stays with We Fix Ugly Pools.

This field is for validation purposes and should be left unchanged.
01

Chapter 1

Why self-managing a remodel is tempting

Some of the pitch is true, and you should know which parts.

Many remodel trades sell direct

Plaster and pebble crews, tile setters and deck coaters often work directly for homeowners, so you can get quotes without a general contractor in the middle.

It looks like a small job

No excavation, no steel, no shotcrete. A resurface seems like “just a new coat,” and tile looks like a weekend project.

You can pick every material

Choose your exact pebble color, tile and coping without a remodeler’s sample book narrowing the options.

It’s legal

Arizona’s owner-builder exemption covers improving your own home, and many resurfacing jobs don’t even need a building permit. (Chapter 3 explains why that last part should worry you, not reassure you.)

Who it can work for

Homeowners with real pool or concrete experience, a pool whose shell, plumbing and tile are known to be sound, flexible weekday hours for about three weeks straight, and the ability to personally supervise a four-week startup. If that’s not you, read chapters 2 through 7 closely.

02

Chapter 2

Why remodeling is harder than building

People assume a remodel is the easy version of a pool project. For a professional, remodeling is its own specialty, and many new-pool builders avoid it. For an owner-manager, it’s the riskier of the two. Here’s why.

You inherit someone else’s work

A new build starts from zero. A remodel starts with a 15-, 25- or 40-year-old shell, plumbing, bond beam and deck built by people you’ll never meet, often repaired several times since. Every earlier shortcut becomes your problem.

You can’t see the problems until it’s drained

Delamination, structural cracks, a damaged bond beam, leaking returns and rotted light niches are hidden under water and old finish. You find them after you’ve committed, with crews already scheduled.

The clock starts when the water comes out

An empty pool in Arizona sun can crack, the exposed shell dries out, and the finish must be applied and the pool refilled on a tight sequence. A new build can pause between phases. A drained remodel can’t.

New finish has to bond to an old surface

New plaster or pebble only lasts if the old surface is prepped correctly: chipped out or hydroblasted, cleaned, and bond-coated where needed. If the prep is wrong, the new finish can pop off in sheets, and the finish crew will blame the prep.

The finish is a one-shot application

Plaster and pebble go on in a single day and can’t be touched up invisibly. A bad application, a dust storm, or a monsoon cell over your yard can mean a full redo.

Startup decides the warranty

The first 28 days of water chemistry and brushing shape how the new finish looks and lasts. When you run the startup, stains, scaling and etching are easy for the finish crew to blame on you.

Everything is connected

Tile sits on the bond beam, coping sits on the tile and deck, and the finish meets the tile line. Replace one and you disturb the next. Separate trades each fix their piece and leave the joints between them to you.

Fewer inspections catch less

A new pool gets several city inspections. A resurface often gets none. That can feel like a benefit, but it means no one independent checks the prep, bonding, drain covers or electrical before the water goes back in.

The short version

Building a pool yourself means managing trades you chose on ground nobody has touched. Remodeling it yourself means managing trades you chose on top of problems nobody has found yet, on a deadline set by an empty pool in the desert sun.

03

Chapter 3

What Arizona law says

Pool work in Arizona normally requires a license from the Registrar of Contractors (ROC). Improving your own home is an exemption, but only when the work is done in one of three ways:

A.R.S. § 32-1121(A)(5)

“Owners of property who improve such property or who build or improve structures or appurtenances on such property and who do the work themselves, with their own employees or with duly licensed contractors, if the structure … [is] intended for occupancy solely by the owner … and [is] not intended for sale or for rent.”

1

You do it

Your own hands and tools.

2

Your employees do it

People on your payroll, with payroll taxes and workers’ comp.

3

Licensed contractors do it

Each trade holds an active ROC license and contracts directly with you.

The remodel world is full of unlicensed crews. Cash-only plaster crews, tile setters without a license, and “my guy” referrals are more common in remodeling than in new construction, because many remodel jobs happen without a permit. Hiring them doesn’t fit any of the three options above. It also leaves you with no ROC complaint and no Recovery Fund if the work fails.

“No permit needed” doesn’t mean “no rules.” Many Valley cities don’t require a permit to replaster. But electrical work, gas lines, new equipment circuits, structural repairs and changes to the pool’s shape usually do. Pool barrier rules still apply to your yard. And in Phoenix, draining the pool has its own rules (chapter 5).

Consultants are contractors too. Since 2019, anyone who, for pay, hires or fires trades, schedules the work, or selects and buys materials for your project is a contractor under the law and needs a license:

A.R.S. § 32-1101(A)(3)(b)

“Includes … consultants who represent that they are able to supervise or manage a construction project for the property owner’s benefit, including hiring and firing specialty contractors, scheduling work on the project and selecting and purchasing construction material.”

The handyman exemption won’t cover it

The under-$1,000 exemption doesn’t apply when the work is part of a larger project, or when a job is split up to stay under the limit. A pool remodel is a larger project.

A.R.S. § 32-1121(A)(14)

A business license isn’t an ROC license

A city business license or TPT license says nothing about contracting. Look up the ROC number yourself at roc.az.gov before anyone drains your pool.

Unlicensed work has no backstop

Contracting without a license is a class 1 misdemeanor. The unlicensed crew can’t sue you or lien you, but you also have no ROC complaint and no Recovery Fund when their work fails.

A.R.S. § 32-1164 · § 32-1153 · § 33-981(C)

Sell within a year and it looks like contracting

Selling or offering your home for sale or rent within a year of the work is prima facie evidence it was done for sale. Flippers take note.

A.R.S. § 32-1121(A)(5)

04

Chapter 4

What’s hiding under your finish

Every one of these is something we regularly find after a pool is drained. A professional remodeler expects them, prices contingencies for them, and knows how to fix them the same day. As an owner-manager, you’ll be finding them, diagnosing them and hiring someone to fix them while your pool sits empty.

Pool being drained for resurfacing in a backyard
Once the water is out, every hidden problem becomes visible, and the clock starts.
Hidden problem Why it matters Who you’d need
Delaminated old finish Hollow-sounding areas must be removed or the new finish will fail with them. Chip-out crew, finish crew
Structural cracks vs. surface checks Surface checking is cosmetic. A structural crack through the shell will telegraph through any new finish unless it’s properly repaired. Crack repair or structural specialist
Damaged bond beam Old tile and coping removal can crack the top of the shell. New tile set on a damaged beam won’t stay put. Mason, tile setter
Plumbing leaks A leak under the deck or at a return fitting will keep leaking under your new finish, and finding it later means cutting concrete. Leak detection, plumber
Skimmer throat and fitting leaks Cracked skimmer throats and loose fittings are common leak points that must be sealed before the finish goes on. Plumber, finish crew
Light niche and cord problems Rusted niches, short cords and old incandescent fixtures are best fixed while the pool is empty. Licensed electrician
Missing or broken bonding Older pools may have bonding that doesn’t meet current code. New equipment or lights can trigger required upgrades. Licensed electrician
Outdated drain covers Suction outlet covers expire and must meet federal anti-entrapment standards. A remodel is when they should be replaced. Plumber or finish crew
Failing coping and deck joints Loose coping and open expansion joints let water behind the tile and under the deck. Mason, deck contractor
Hydrostatic relief valve issues An empty pool can crack or shift if groundwater builds up underneath. That’s rare in most of the Valley but real near lakes, irrigation or after heavy monsoon rain. Experienced remodeler

Action step

Before you drain anything or book a finish crew, pay for a leak detection and pressure test and a walkthrough by someone who can tell a structural crack from surface checking. A few hundred dollars up front is the cheapest insurance in this entire guide.

05

Chapter 5

The clock starts when the water comes out

A remodel is a relay race. Each trade has to be ready the moment the one before it finishes, because the pool can’t sit empty for long. Highlighted rows are the points where a mistake is hardest to undo.

  1. Assessment: leak detection, pressure test and a structural walkthrough while the pool is still full.
  2. Material selection and ordering. Tile, coping and finish colors ordered and on hand before draining. Backorders are a common reason pools sit empty.
  3. Schedule every trade. Drain, chip-out, repairs, tile, coping, finish, fill and startup, all booked back to back.
  4. Drain legally. In Phoenix, pool water goes into your home’s sewer cleanout, never the street, alley or storm drain. Other Valley cities have similar rules, and salt-water discharge is restricted.
  5. Chip-out or hydroblast the old finish, remove debris and haul it off.
  6. Uncover and decide. Delamination, cracks, bond beam damage and leaks are now visible. Every decision here changes the price and the schedule.
  7. Repairs: cracks, fittings, skimmer throat, light niches, drain covers, plumbing.
  8. Electrical and bonding updates if you’re adding lights or equipment. These typically need a permit.
  9. Old tile and coping removal, carefully, to avoid damaging the bond beam.
  10. New waterline tile and coping, set level, with correct expansion joints to the deck.
  11. Surface prep and bond coat so the new finish bonds to the old shell.
  12. Interior finish application: one day, weather permitting. Plaster, quartz or pebble.
  13. Fill immediately and without stopping. Stopping the fill can leave a permanent ring in the new finish.
  14. Startup chemistry: daily testing, brushing and adjusting for about 28 days. Arizona’s hard water makes this critical.
  15. Equipment startup and any new equipment programming.
  16. Final walkthrough and punch list. Often skipped when there’s no one accountable for the whole job.
Finish crew smoothing new pool plaster
The finish goes on in a single day. Prep, weather and timing all have to be right, because it cannot be touched up invisibly.

Arizona sun is hard on an empty shell

A drained shell exposed to 110°F heat dries out and moves, and finish crews work early mornings in summer for a reason. Every extra day empty adds risk.

Monsoon and dust storms

Wind-blown dust and rain on fresh plaster or pebble can mean spotting, streaking or a redo. Pros watch the forecast and reschedule. A one-off homeowner job is the first to get bumped.

Want this guide as a printable PDF? It includes the checklist, the 12 trade questions and the savings worksheet.

Get the free PDF

06

Chapter 6

The savings math on a remodel

This is where self-managed remodels make the least sense. A remodel costs a fraction of a new pool, so any percentage you save is a small dollar amount, while a single failure costs as much as the whole job.

In 2026, most Phoenix-area remodels run $12,000 to $20,000. Resurfacing with new tile typically runs $8,000 to $15,000, with pebble at the top of that range. Take a $16,000 remodel: pebble finish, new waterline tile and coping.

15%What you might save on trade pricing, being generous
−3%Retail tile, coping and supplies without a remodeler’s pricing
−2%Leak test, drain pump, water, extra haul-off and return trips
−?Whatever the drained pool reveals (chapter 4)
~10%Best case: about $1,600 on a $16,000 remodel, if nothing is hidden

One redo erases it

If a finish delaminates or has to be redone, the chip-out and new finish alone can cost several times what you saved.

One hidden leak erases it

Finding and fixing a leak under a new deck or finish often costs more than $1,600 by itself.

Your time erases it

Figure 50 to 80 hours of calls, meetings, supply runs, waiting on crews and 28 days of startup. Divide $1,600 by that.

The honest math

On a new pool, self-managing might save thousands if everything goes right. On a remodel, the best case is often around $1,500 to $2,000, and the worst case is paying for the remodel twice.

07

Chapter 7

Who fixes it when it fails

When one remodeler does the whole job, one company owns the result. When you hire the trades separately, each one warrants only its own piece, to the ROC’s minimum standards. Remodel failures almost always happen where one trade’s work meets another’s.

Who is accountable: one remodeler vs. self-managed remodel With one remodeler, you deal with one company that answers for every step. Self-managing, you sit in the middle of ten separate trades and suppliers. WITH ONE REMODELER SELF-MANAGED REMODEL You Licensed remodelerone contract · one warranty Drain Prep Repair Tile Coping Finish One crew lead checks every step. One warranty covers the joints. Leak detection Crack repair Plumber Electrician Chip-out crew Tile setter Mason / coping Finish crew Equipment Supply house Youthe project manager
With one remodeler, you make one call. Self-managing, you connect every trade, and you own every joint between their work.

What the finger-pointing looks like

The finish pops off

Six months later, sections of new pebble sound hollow and start flaking. The finish crew says the chip-out and bond coat were done wrong. The prep crew says the finish was applied too thin or too late. You have two contracts and no answer.

The crack comes back

A line shows through the new plaster exactly where the old crack was. The crack-repair contractor says the finish crew didn’t stage it. The finish crew says the repair failed. On your job, you pay for the next attempt.

The stains and scale

Blotches and white scale appear during startup. The finish crew says your chemistry caused it and points to their warranty terms. With no documented startup, you have nothing to show them.

The tile line is crooked

The new tile follows an old, uneven bond beam. The tile setter says the beam was already off. Once the finish is in, fixing it means cutting it out.

The coping gap

New coping meets the old deck with an open joint that lets water in. The mason blames the deck. The deck contractor was never hired. That leaves you.

The level keeps dropping

The pool loses water after the remodel. Is it a fitting the finish crew covered, a line the tile setter cracked, or a leak that was there before? Each trade says it isn’t theirs.

Aerial view of an unfinished, drained pool surrounded by safety fencing
A remodel that stalls with the water out gets more expensive every day it sits.

What we see

Some of the hardest calls we take are from homeowners with a pool that’s been drained for weeks: the finish crew didn’t show, a problem turned up nobody could price, or the new finish failed and nobody will take responsibility. Once a remodel stalls with the water out, every day costs more.

08

Chapter 8

Protections you give up

One warranty for the whole job

A single remodeler warrants the finished pool, including the prep under the finish and the joints between trades. Separate trades warrant separate pieces, and the joints between them belong to nobody.

A written contract with the full scope

A licensed contractor’s residential contract must list its license number, total price including tax, the payment schedule, an estimated completion date and your right to file an ROC complaint. A cash crew’s text message quote doesn’t.

A.R.S. § 32-1158

An ROC order to fix the work

For two years, the ROC can order a licensed contractor to correct work below its workmanship standards. With separate trades, that works one trade at a time, and only against licensed ones.

A.R.S. § 32-1162 · A.A.C. R4-9-108

The Recovery Fund

The Residential Contractors’ Recovery Fund can compensate homeowners harmed by a licensed residential contractor, up to $30,000 per claim. It doesn’t cover unlicensed crews, and with several licensed trades you must prove which one caused the damage.

A.R.S. § 32-1132 · § 32-1132.01

Lien protection

Arizona generally bars liens on an owner-occupied home by anyone who didn’t contract directly with the owner. When you hire every trade and supplier directly, each one can lien your home if unpaid.

A.R.S. § 33-1002 · § 33-992.01

Manufacturer finish warranties

Finish manufacturers’ warranties typically depend on an approved applicator and a proper startup. Read the warranty terms before you buy the finish, and before you agree to run the startup yourself.

Workers’ compensation

Licensed contractors carry workers’ comp. If an uninsured worker is hurt in your empty pool, your homeowner’s policy may not cover it. Ask your insurer before work starts.

A.R.S. § 23-902

A schedule someone else owns

A remodeler with its own crews controls the sequence. As an owner-manager, a single no-show trade leaves your pool empty, and you’re the one making calls.

09

Chapter 9

Warning signs

Watch for these when you’re collecting quotes from individual remodel trades or anyone offering to “coordinate” your remodel.

1

No ROC numberNot on the quote, truck or website, or the number belongs to another company. Check roc.az.gov.
2

Cash only, big deposit“Half up front for materials.” That’s a common setup for a crew that never comes back.
3

“We’ll just go over it”Offering to put new finish over the old surface without checking for delamination or planning prep and bond coat.
4

No leak or crack planNo mention of pressure testing, crack repair, or what happens if they find something after draining.
5

“Startup’s on you”No written startup instructions, or warranty terms that disappear the moment you touch the chemistry.
6

Drain it into the streetAnyone who suggests draining to the street or alley is telling you they don’t know or don’t follow the rules.
7

A coordination feeSomeone unlicensed who wants a fee to schedule, hire or buy for your remodel is acting as an unlicensed contractor.
8

Square-foot price onlyA price per square foot with no line for chip-out, haul-off, repairs, tile line or startup. The extras show up after the water’s gone.
10

Chapter 10 · Checklist

If you do it anyway: protect yourself

If you decide to manage your own remodel, do every item on this list. Tick them off as you go; your progress is saved in this browser.

0 of 12 complete












11

Chapter 11 · Bring this to every quote

12 questions for every remodel trade

  1. What’s your ROC license number, and what classification is it?
  2. What exactly is included: chip-out, haul-off, repairs, bond coat, fittings, drain covers, startup?
  3. What happens to the price and schedule if you find delamination, cracks or leaks after draining?
  4. Who’s responsible for surface prep, and will your warranty cover the finish if someone else did the prep?
  5. What startup do you require to keep the warranty, and will you do it or show me how?
  6. What’s your written warranty, and what voids it?
  7. How do you handle weather: wind, dust and monsoon rain on application day?
  8. Where will the pool water go, and who handles draining?
  9. How much deposit do you need, and what are the payment stages?
  10. Do you carry liability insurance and workers’ comp? Can I see the certificates?
  11. Who’s on site on application day, and who do I call if something goes wrong?
  12. If another trade damages your work, or your work affects theirs, how do you handle it?
12

Chapter 12 · Worksheet

What would you actually save?

Put a licensed remodeler’s complete quote on one side and your own written trade quotes on the other. The figures below are example numbers for a $16,000 pebble-and-tile remodel. Replace them with yours.


Estimated savings before your time

$0

Your self-managed total$0
Contingency included$0
Savings as % of quote0%
What you paid yourself per hour$0

Adjust the numbers to match your quotes.

Compare the result to the cost of one redo. If the new finish has to come out, you pay for chip-out and a second finish, often more than the whole savings column. That’s the risk you’re weighing.

+

For owner-managed remodels

Still want to manage your own remodel? Let our experience work for you.

If you still want to run your own remodel, you don’t have to do it without a safety net. We Fix Ugly Pools is a licensed Arizona contractor (ROC KA5-353555), and we can take on only the pieces where mistakes are most expensive, each under its own written contract.

Option A

We do the interior. You handle the rest.

We drain, prep, repair, bond coat, apply your plaster, quartz or pebble finish, fill and run the startup, all under one warranty. You handle the decking, landscaping, lighting and other extras on your own schedule.

Option B

Hire us for individual trades

Waterline tile, coping, crack repair or equipment installation, each quoted at a fixed price under its own contract and warranty.

Option C

Equipment, professionally installed

Pumps, filters, heaters, automation and sanitation supplied and installed by a licensed contractor, with manufacturer warranties registered for you.

Option D

Leak test and pre-remodel inspection

Leak detection, a pressure test and a walkthrough before you drain, so you know what you’re dealing with before the clock starts.

Who’s responsible for what, in writing

Responsibility A · Interior B · Individual trades C · Equipment D · Inspection
Fixed written price for our work Yes Yes, per scope Yes Yes
Our warranty Prep, repairs, finish and startup together The trade we perform Our installation; manufacturer warranty registered Findings and advice; no warranty on others’ work
ROC accountability for our work Yes Yes, our scope Yes, our scope Yes, our inspection
Draining and refilling legally We do You, unless you add it to our scope
Scheduling, buying for and paying other trades You. We never schedule, hire, buy for or pay trades we don’t employ.

What we don’t do

We don’t charge “coordination” fees to manage your trades. If you want one company responsible for the entire remodel, we’ll do the whole job under our own license and you’ll get every protection in chapter 8.

The licensed alternative

One remodeler. One warranty. No finger-pointing.

We Fix Ugly Pools completes more than 700 renovations a year across the Valley. We know what’s under an Arizona pool’s finish because we’ve drained thousands of them, and we price and plan for it before your water comes out.

Glendale pool remodel before and after by We Fix Ugly Pools
A real We Fix Ugly Pools remodel in Glendale: one contract, one crew schedule, one warranty.
700+Renovations every year
20,000+Pools built or renovated
4.9★305+ Google reviews
2001Remodeling in the Valley since

Most of our 2026 remodels run $12,000 to $20,000. Resurfacing with tile generally runs $8,000 to $15,000, and adding equipment, plumbing or decking typically brings it to $15,000 to $30,000. Every job comes with one contract, one crew schedule and one warranty.

Full remodel

Assessment, draining, repairs, tile, coping, finish, startup and equipment. You choose the look; we handle the rest.

Managing it yourself?

Hire us for only the pieces you’d rather not risk: the interior, a single trade, the equipment or a pre-drain inspection. See the four options above.

Already drained and stuck?

If your remodel stalled with the water out, call us for an honest assessment of what’s there and what it will take to finish it right.

Get a free remodel consultation

Call (602) 253-4499 · Visit our showroom at 1924 W Greenway Rd, Phoenix · We Fix Ugly Pools Arizona, AZ ROC KA5-353555

13

Chapter 13

The bottom line

Arizona lets you manage your own pool remodel, and for someone with real experience and a pool known to be sound, it can work. For most homeowners, it’s a bigger gamble than building new: you inherit problems you can’t see, you work against an empty-pool deadline, and you depend on trades who each own only their piece.

The savings on a remodel are measured in hundreds or low thousands of dollars. A single failure is measured in the full cost of the job. Weigh those honestly, and if you go ahead, use the checklist in chapter 10.

Thinking about a new pool instead? Read our companion guide to building your own pool in Arizona.

A new pool starts with a clean hole. A remodel starts with someone else’s mistakes.

Want this guide as a printable PDF? It includes the checklist, the 12 trade questions and the savings worksheet.

Get the free PDF

14

Chapter 14

Frequently asked questions

Can I remodel my own pool in Arizona without a contractor’s license?

Yes. Under A.R.S. § 32-1121(A)(5), you can improve your own home without an ROC license if you do the work yourself, use your own employees, or hire licensed contractors directly, and the home isn’t intended for sale or rent. Anyone you pay to do the work, or to hire, schedule or buy for you, generally needs an ROC license.

Is remodeling a pool harder than building a new one?

For a homeowner managing it, often yes. A remodel starts with an existing shell, plumbing and tile that may hide delamination, cracks and leaks you can’t see until the pool is drained, and the work has to happen on a tight schedule once the water is out. Separate trades also tend to blame each other’s prep when a new finish fails.

How much can I save by managing my own pool remodel?

On a typical $16,000 Phoenix-area remodel, best-case savings are often around 10%, or about $1,600, before counting your time and anything found after draining. A single failed finish or hidden leak can cost more than that to fix.

Do I need a permit to resurface my pool in Arizona?

Many Valley cities don’t require a building permit to replaster or resurface, but electrical, gas, structural work and new equipment circuits usually do. Check with your city before work starts. Pool barrier and draining rules apply either way.

Where can I drain my pool in Phoenix?

In Phoenix, drain a pool into your home’s sewer cleanout, not the street, alley or storm drain. Discharging to the right-of-way requires a city permit and dechlorinated water, and saltwater and backwash discharge to the right-of-way is prohibited. Other Valley cities have similar rules.

Who is responsible if my new pool finish fails?

If one licensed remodeler did the whole job, that contractor is responsible. If you hired separate trades, each is responsible only for its own work, and you have to show which one caused the failure, such as poor prep versus poor application.

Read the sources yourself

  1. A.R.S. § 32-1121, owner-builder and small-job exemptions
    azleg.gov/ars/32/01121.htm
  2. A.R.S. § 32-1101, definition of contractor (amended by SB 1397, 2019)
    azleg.gov/ars/32/01101.htm
  3. A.R.S. § 32-1153, license required to sue
    azleg.gov/ars/32/01153.htm
  4. A.R.S. § 32-1164, contracting without a license
    azleg.gov/ars/32/01164.htm
  5. A.R.S. § 32-1158, residential contract requirements
    azleg.gov/ars/32/01158.htm
  6. A.R.S. § 32-1132 and § 32-1132.01, Residential Contractors’ Recovery Fund
    azleg.gov/ars/32/01132.htm
  7. A.R.S. § 32-1162, time limits for ROC complaints
    azleg.gov/ars/32/01162.htm
  8. A.A.C. R4-9-108 and ROC Workmanship Standards
    roc.az.gov
  9. A.R.S. § 33-1002, liens against owner-occupied homes
    azleg.gov/ars/33/01002.htm
  10. A.R.S. § 33-981, lien rights of licensed contractors
    azleg.gov/ars/33/00981.htm
  11. A.R.S. § 33-992.01, preliminary twenty-day notice
    azleg.gov/ars/33/00992-01.htm
  12. A.R.S. § 23-902, employers subject to workers’ compensation
    azleg.gov/ars/23/00902.htm
  13. City of Phoenix, Draining and Backwashing Your Pool (City Code Chapter 32C)
    phoenix.gov
  14. Arizona Registrar of Contractors, license lookup
    roc.az.gov
  15. U.S. Consumer Product Safety Commission, Virginia Graeme Baker Pool & Spa Safety Act
    cpsc.gov